Devrindo Widya
1997 – Present PT. Devrindo Widya, Karawang – West Java, Indonesia
Senior Civil Engineer
Responsibility:
-
Calculated and design Civil/structure works.
-
Check/review report from Quality Control.
-
Check/review structure drawing
To Following Projects:
1. Mill Spinning Finish Plant, Spin bath and
Clarifier - PT. Indobharat Rayon, Cikampek – Indonesia.
Calculated and design Civil/structure works.
2. Continuous Casting Machine Plant and Ladle Turret Foundation - PT. Master Steel, P.Gadung – Indonesia.
Calculated and design Civil/structure works.
3. Mosque Texmaco Subang - Texmaco – Indonesia.
Calculated and design Civil/structure works.
4. Production Building - PT. Sungintex, Bekasi – Indonesia.
Area: 58.0 m x 95.0.This building have first floor at elevation +4.35 m from steel for overall
building.
5. Cutting Building - PT. Texmaco Jaya, Pemalang - Indonesia
Area: 73.0 m x 108.0 m.
6. Fleece Expansion Building - PT. Texmaco Jaya, Karawang - Indonesia.
Area: 60.0 m x 192.0.
7. Triangular Portion Building - PT.Texmaco Jaya, Karawang - Indonesia.
Area: 30.0 m x 50.0 m.
8. Connection Building - PT. Texmaco Jaya, Karawang - Indonesia
9. Store Building - PT. Texmaco Jaya, Karawang – Indonesia.
10. Boiler Shed - PT. Texmaco Jaya, Karawang – Indonesia.
11. Maintenance Shed - PT. Texmaco Jaya, Karawang – Indonesia.
BinaSwadaya Perkasa
1994 – 1997 PT. BinaSwadaya Perkasa – Jakarta - Indonesia.
Site Manager/Project Coordinator
Responsibility:
-
Calculation Material takes off.
-
Calculation and design Civil/structure work.
-
Check/review report from Quality Control.
-
Check/review structure drawing.
-
Make a Schedule of project progress.
To Following Projects:
1. Roof trusses Pertamina Building, Balongan - Indonesia.
Design and calculation material for roof and material takes off.
2. Partition and Window wall Library, East Jakarta – Indonesia
Supervising at site for installation and progress schedule.
3. Window wall, Cladding wall and Curtain wall Hero Head Office,Gatot Subroto. -
Indonesia.
Materials take off, Schedule of project, shop drawing and site supervising for Building 16th
floor.
4. Canopy, Window wall and Curtain wall of IFS Building, Kwitang - Indonesia.
Design for canopy at entrance, materials take off, Schedule
of project and shop drawing for Building 9th floor.
5. Window wall and Cladding wall of Hero Supermarket, Pondok Gede - Indonesia.
Materials take off, Schedule of project, shop drawing and site supervising.
6. Window wall and Curtain wall of Berca Building, Cikini - Indonesia.
Materials take off, Schedule of project, shop drawing and
site supervising for Building 11th
floor.
7. Roof Truss, Window wall, Cladding wall and Curtain wall of Kosambi Market-Bandung
Design and calculation for roof market using steel material. Materials take off,
Schedule of project and shop drawing.
Caraka Pranamulti
1993 – 1994 PT. Caraka Pranamulti, Jakarta - Indonesia
Engineer.
Responsibility
Civil/structure design.
To Following Projects:
1. ICI Warehouse, Bogor.
Design and calculation roof
2. Tennis Stadium In Door, Cijantung.
Design and calculation tribune